---
agent:
  instructions: "Use this search API to find relevant content across this site with keywords or natural-language queries, instead of crawling individual pages. Results are returned in Markdown."
  endpoint: "https://pfastreatmentvendors.com/.well-known/search?q={query}"
  method: "GET"
  documentation: "https://developers.cloudflare.com/ai-search/how-to/search-for-agents/"
title: "What goes into a PFAS treatment construction bid? | PFAS Treatment Vendors"
description: "Read a public construction bid by scope before comparing budget quotes."
image: "https://pfastreatmentvendors.com/og.jpg"
url: "https://pfastreatmentvendors.com/cost/"
last_updated: "2026-11-28"
---

> Site index for agents: https://pfastreatmentvendors.com/llms.txt

# What goes into a PFAS treatment construction bid?

Orange County Water District authorized a $23,587,500 construction award for the John Garthe Reservoir project. That scope includes ion exchange vessels, pretreatment, well modifications and on-site disinfection equipment. Compare it with bids for the same scope and keep design and construction management as separate lines. [OCWD award resolution and bid tabulation](https://www.ocwd.com/wp-content/uploads/BOD_20260218-1.pdf)

Sources checked 28 Nov 2026

[Request quotes](https://pfastreatmentvendors.com/cost/#quote)

## Vendor evidence

| Name | Procurement role | Technology / methods | Documented design flow MGD | Public project and role | Verified |
| --- | --- | --- | --- | --- | --- |
| [Tetra Tech](https://pfastreatmentvendors.com/tetra-tech/) | Engineering & construction | Ion exchange | 13.8[3](https://www.ocwd.com/what-we-do/water-quality/pfas/santa-ana-project/ "Source: OCWD John Garthe Reservoir project (accessed 2026-11-28)") | John Garthe Reservoir · design contractor | 2026-11-28 |
| [Kingmen Construction](https://pfastreatmentvendors.com/kingmen-construction/) | Engineering & construction | Ion exchange | 13.8[1](https://www.ocwd.com/what-we-do/water-quality/pfas/santa-ana-project/ "Source: OCWD John Garthe Reservoir project (accessed 2026-11-28)") | John Garthe Reservoir · construction award SA-2025-1 | 2026-11-28 |

## Price your basis of design

Separate pre-treatment, vessels, controls, site and electrical work, commissioning, media replacement and residuals hauling. Ask bidders to put price validity, exclusions and delivery milestones in writing.

*   [MassDEP / UMass treatment comparison](https://www.mass.gov/doc/pfas-treatment-technologies-options-trade-offs-and-decision-factors-3192026/download)

Include your design flow or sample count, water matrix, PFAS results and target date. For a treatment request, add your residuals plan.

## Request PFAS quotes

Tell PFAS Treatment Vendors what you need and the right PFAS vendors get it and contact you directly.

Your request is in. PFAS Treatment Vendors matches it to the PFAS vendors that fit.

Your request didn't go through. Check your email address and try sending it to PFAS Treatment Vendors again, or reach us at [hello@pfastreatmentvendors.com](mailto:hello@pfastreatmentvendors.com).

```json
{"@context":"https://schema.org","@graph":[{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"PFAS Treatment Vendors","item":"https://pfastreatmentvendors.com/"},{"@type":"ListItem","position":2,"name":"Project cost","item":"https://pfastreatmentvendors.com/cost/"}]},{"@type":"ItemList","@id":"https://pfastreatmentvendors.com/#list","name":"What goes into a PFAS treatment construction bid?","numberOfItems":2,"itemListOrder":"https://schema.org/ItemListUnordered","itemListElement":[{"@type":"ListItem","position":1,"name":"Tetra Tech","url":"https://pfastreatmentvendors.com/tetra-tech/"},{"@type":"ListItem","position":2,"name":"Kingmen Construction","url":"https://pfastreatmentvendors.com/kingmen-construction/"}]}]}
```
