ECT2
Supplied lead–lag ion exchange equipment and conducted on-site pilot testing for municipal drinking water in West Deptford.
Ion exchange
Sources checked
Procurement evidence
- Technology / methods Named PFAS treatment process or laboratory methods, with matrix or program scope in the source.
- Ion exchange 1
- Procurement role Role in the documented PFAS offering or project.
- Treatment supplier 1
- Product / service Named product, engineering service or testing scope.
- Parallel trains of lead–lag IX vessels 1
- Applications Documented water matrix, sector or sample type.
- Municipal drinking water 1
- Public project and role Named public project with the vendor’s documented role.
- West Deptford, New Jersey · Well 8 equipment supply 1
- Documented design flow MGD Largest project or configuration with verified flow for this record. The linked capacity belongs to that specific design.
- 1.44 1
- Deployment / case reference Named deployment, assessment or case study with its published stage.
- West Deptford · on-site comparison of GAC and IX before design 1
- Delivery / media handling Documented delivery format, operations scope or spent-media service.
- Synthetic resin regeneration approach 2
Sources
- ECT2 · source accessed 2026-11-28
- A&WMA exhibitor materials accessed 2026-11-28
Browse by requirement
Related records
Include your design flow or sample count, water matrix, PFAS results and target date. For a treatment request, add your residuals plan.
Request PFAS quotes
Tell PFAS Treatment Vendors what you need and the right PFAS vendors get it and contact you directly.
Your request is in. PFAS Treatment Vendors matches it to the PFAS vendors that fit.
Your request didn't go through. Check your email address and try sending it to PFAS Treatment Vendors again, or reach us at hello@pfastreatmentvendors.com.