Which PFAS projects document design flow?
5 records with documented project design flow. ECT2 supplied equipment for West Deptford’s 1.44 million gallon per day ion exchange system. Tetra Tech designed Santa Ana’s 13.8 million gallon per day project. Use the cited project flow and configuration as reference points for your own peak flow, redundancy and pressure loss requirements. West Deptford design and installation case
Sources checked
Request quotesVendor evidence
| Xylem / Evoqua | Treatment supplier | Granular activated carbon and ion exchange | 4.324 | Fullerton Kimberly Well 1A · treatment vessels pre-purchased | 2026-11-28 |
|---|---|---|---|---|---|
| ECT2 | Treatment supplier | Ion exchange | 1.441 | West Deptford, New Jersey · Well 8 equipment supply | 2026-11-28 |
| AqueoUS Vets | Treatment supplier | Ion exchange and granular activated carbon | 4.325 | Fullerton Kimberly Well 1A · treatment vessels pre-purchased | 2026-11-28 |
| Tetra Tech | Engineering & construction | Ion exchange | 13.83 | John Garthe Reservoir · design contractor | 2026-11-28 |
| Kingmen Construction | Engineering & construction | Ion exchange | 13.81 | John Garthe Reservoir · construction award SA-2025-1 | 2026-11-28 |
Read the number at project level
West Deptford’s reference flow converts 1,000 gallons per minute to a daily rate at continuous operation. The John Garthe figure is the utility’s design flow for the facility.
Include your design flow or sample count, water matrix, PFAS results and target date. For a treatment request, add your residuals plan.
Request PFAS quotes
Tell PFAS Treatment Vendors what you need and the right PFAS vendors get it and contact you directly.
Your request is in. PFAS Treatment Vendors matches it to the PFAS vendors that fit.
Your request didn't go through. Check your email address and try sending it to PFAS Treatment Vendors again, or reach us at hello@pfastreatmentvendors.com.