Kingmen Construction
Won the civil construction contract for Santa Ana’s John Garthe Reservoir ion exchange facility.
Ion exchangeRemediation engineering
Sources checked
Procurement evidence
- Technology / methods Named PFAS treatment process or laboratory methods, with matrix or program scope in the source.
- Ion exchange 1
- Procurement role Role in the documented PFAS offering or project.
- Engineering & construction 2
- Product / service Named product, engineering service or testing scope.
- PFAS facility construction 2
- Applications Documented water matrix, sector or sample type.
- Municipal groundwater and drinking water 1
- Public project and role Named public project with the vendor’s documented role.
- John Garthe Reservoir · construction award SA-2025-1 2
- Documented design flow MGD Largest project or configuration with verified flow for this record. The linked capacity belongs to that specific design.
- 13.8 1
Sources
- OCWD John Garthe Reservoir project accessed 2026-11-28
- Kingmen Construction · source accessed 2026-11-28
Browse by requirement
Related records
Include your design flow or sample count, water matrix, PFAS results and target date. For a treatment request, add your residuals plan.
Request PFAS quotes
Tell PFAS Treatment Vendors what you need and the right PFAS vendors get it and contact you directly.
Your request is in. PFAS Treatment Vendors matches it to the PFAS vendors that fit.
Your request didn't go through. Check your email address and try sending it to PFAS Treatment Vendors again, or reach us at hello@pfastreatmentvendors.com.